Description
Hünnebeck Manto 330
Wall formwork for site use by crane.
- strong connection through straightening clamp: 40 m² formwork surface in a crane lift without additional stiffeners
- highest bending strength due to the 14 cm high steel frame; permissible concrete pressure 80 kN / m²
- Efficient shelling of large areas without equalization and with few anchor points using MANTO XXL panels
- Easy and fast loading and unloading of manholes with the MANTO shaft corner
- Consistently good concrete appearance due to galvanizing of the frame and high-quality formwork skins
- Also suitable for shelling single-sided walls.
Reviews
There are no reviews yet.